导航:首页 > 运动场馆 > 鸟巢体育馆英语

鸟巢体育馆英语

发布时间:2021-02-21 17:02:42

Ⅰ 鸟巢水立方的英文是什么

鸟巢水立方的英文:Bird's Nest Water Cube

Water 读法 英['wɔːtə]美[ˈwɔtɚ]

1、n. 水;海水;雨水;海域,大片的水

2、vt. 使湿;供以水;给…浇水

3、vi. 加水;流泪

短语:

1、fresh water湖水,淡水

2、cold water冷水;凉水;凉开水

3、high water高潮,高水位;水位达到最高点的

4、water injection注水;喷水

5、ground water地下水

(1)鸟巢体育馆英语扩展阅读

一、water的词义辨析:

water的复数形式waters常可看作是另外一个词,这两个词的共同意思是“水”,其区别是:water用作名词时的意思是“水”,是物质名词,不可数,没有复数形式,用作动词时意思是“浇水”“加水”; 而waters表示“矿泉水”“近海海域”。例如:

1、I was very thirsty and drank quite a few cups of water.我渴极了,喝了好几杯水。

2、He is watering the sunflowers.他在给向日葵浇水。

3、These vessels frequent the waters of the Pacific Oceans.这些船只常出入太平洋水域。

二、water的近义词:liquid

liquid 读法 英['lɪkwɪd]美['lɪkwɪd]

1、adj. 液体的;清澈的;明亮的;易变的

2、n. 液体,流体;流音

短语:

1、liquid nitrogen液氮

2、ionic liquid离子液体,离子熔液

3、liquid membrane液膜;液体膜

4、liquid film液膜;液态膜

5、liquid state液态

Ⅱ 求 北京 鸟巢体育馆和水立方的英文介绍!!

Beijing National Stadium (Bird's Nest/Olympic Stadium)

The Beijing National Stadium, also known as the bird's nest will be the main track and field stadium for the 2008 Summer Olympics and will be host to the Opening and Closing ceremonies. In 2002 Government officials engaged architects worldwide in a design competition. Pritzker Prize-winning architects Herzog & de Meuron collaborated with ArupSport and China Architecture Design & Research Group to win the competition. The stadium will seat as many as 100,000 spectators ring the Olympics, but this will be reced to 80,000 after the games. It has replaced the original intended venue of the Guangdong Olympic Stadium. The stadium is 330 metres long by 220 metres wide, and is 69.2 metres tall. The 250,000 square metre (gross floor area) stadium is to be built with 36 km of unwrapped steel, with a combined weight of 45,000 tonnes. The stadium will cost up to 3.5 billion yuan (422,873,850 USD/ 325,395,593 EUR). The ground was broken in December 2003, and construction started in March 2004, but was halted by the high construction cost in August 2004.

In the new design, the roof of the stadium had been omitted from the design. Experts say that this will make the stadium safer, whilst recing construction costs. The construction of the Olympic buildings will continue once again in the beginning of 2005.

In depth
The stadium's appearance is one of synergy, with no distinction made between the facade and the superstructure. The structural elements mutually support each other and converge into a grid-like formation - almost like a bird's nest with its interwoven twigs. The spatial effect of the stadium is novel and radical, yet simple and of an almost archaic immediacy, thus creating a unique historical landmark for the Olympics of 2008.

The stadium was conceived as a large collective vessel, which makes a distinctive and unmistakable impression both from a distance and when seen from up close. It meets all the functional and technical requirements of an Olympic National Stadium, but without communicating the insistent sameness of technocratic architecture dominated by large spans and digital screens.

Visitors walk through this formation and enter the spacious ambulatory that runs full circle around the stands. From there, one can survey the circulation of the entire area including the stairs that access the three tiers of the stands. Functioning like an arcade or a concourse, the lobby is a covered urban space with restaurants and stores that invite visitors to stroll around. Just as birds stuff the spaces between the woven twigs of their nests with a soft filler, the spaces in the structure of the stadium will be filled with inflated ETFE cushions. Originally, on the roof, the cushions were to be mounted on the outside of the structure to make the roof completely weatherproof, but the roof has been omitted from the design in 2004.

While the rain was to be collected for rainwater recuperation, the sunlight was to filter through the translucent roof, providing the lawn with essential ultraviolet radiation. On the facade, the inflated cushions will be mounted on the inside of the structure where necessary, e.g. to provide wind protection. Since all of the facilities -- restaurants, suites, shops and restrooms -- are all self-contained units, it is possible to do largely without a solid, enclosed facade. This allows for natural ventilation of the stadium, which is the most important aspect of the stadium's sustainable design.

The sliding roof was an integral part of the stadium structure. When it was to be closed, it would have converted the stadium into a covered arena; however, the sliding roof was eliminated in an effort to cut costs and increase overall safety of the radical new structure.

Beijing National Stadium
Bird's Nest/Olympic Stadium

Facility statistics
Location Beijing
Broke ground Dec 2003
Opened Unknown
Closed N/A
Demolished N/A
Owner
Surface Grass
Construction cost 3.5 billion yuan
Architect Herzog & de Meuron
ArupSport
CAG
Tenants

Seating capacity
91,000 (80,000 Post Olympics)

水立方的英文介绍
National Swimming Center--Exquisite and Exciting "Water Cube"

A semi-transparent "cube", with "bubbles" spread out all over its surface, is a shape very similar to the structure of "H2O", the outlook for the National Swimming Center at the 2008 Olympic Games. After the games, it will become a recreational water park open to the public.

In Chinese culture, water is an important natural element. It creates a calming atmosphere and inspires happiness. Taking full consideration of the functions of water in recreation and bodybuilding, designers have explored many ways for people of different age groups to appreciate its function. The design is called "Water Cube". Many creative designs have been employed in the creation of the swimming pools at the swimming center. Other high-tech facilities including optical devices used to define positions of athletes, and multiple-angle, three-dimensional screening systems are provided to help spectators enjoy competitions.

The National Swimming Center, one of the three landmark buildings for the 2008 Beijing Olympic Games, is located inside the Beijing Olympic Park. Covering a total floor space of 50,000 square meters, it has 17,000 seats. The project costs about US$100 million. The center will be a venue for swimming, diving, synchronized swimming and water-polo games ring the period of the Olympic Games. After the games, the center will become a large water recreational center open to the public.
In January 2003, Beijing started to solicit design schemes for the National Swimming Center. The international competition settled on "Water Cube" as the winning scheme. It is designed by the design consortium consisting of the China State Construction Engineering Corporation, China State Construction International (Shenzhen) Design Co Ltd, PTW Architects (Australia) and Ove Arup (Australia).

Ⅲ 鸟巢和水立方的英文怎么说

1.北京奥运国家体育场就是俗称的"鸟巢"

"鸟巢"的英文名称是Nest-type Beijing Olympic Stadium或者Beijing National Stadium (Bird's Nest/Olympic Stadium)

鸟巢英文单词是bird nest

2."水立方"的英文是water cube Beijing National Aquatics Cente或water cube

“鸟巢”和“水立方”的英文简介

Beijing National Stadium

TheBeijing National Stadium(traditional Chinese:北京国家体育场;simplified Chinese:北京国家体育场;Hanyu Pinyin:Běijīng Guojiā Tǐyuchǎng;Tongyong Pinyin:Běijīng Guojiā Tǐyuchǎng), also known as theNational Stadium,[1]or the "Bird's Nest" (鸟巢) for itsarchitecture, is astadiumunder construction on theOlympic GreeninBeijing,Chinathat is scheled for completion in March, 2008[2]. The stadium will host the main track and field competitions for the2008 Summer Olympics, as well as the opening and closing ceremonies. It is located right next to theBeijing National Aquatics Centre.

Design

In 2002, Government officials engaged architects worldwide in a design competition.Pritzker Prize-winning architectsHerzog & de Meuroncollaborated with ArupSport and China Architecture Design & Research Group to win the competition. Contemporary Chinese artist,Ai Weiwei, is the Artistic Consultant for design.[3]The ground was broken onChristmas EveDecember2003, and construction started inMarch2004, but was halted by the high construction cost inAugust2004and continued again. InJanuary 2008, concerns about construction working conditions arose when it was revealed that at least 10 workers had died ring the stadium's construction.[4]Controversy also surrounded the alleged forced evictions of many residents so the construction could go ahead.

Capacity

The stadium canseatas many as 91,000 spectators ring the Olympics. The capacity will then be reced to 80,000 after the Games. It has replaced the original intended venue of theGuangdong Olympic Stadium[citation needed]. The stadium is 330metreslong by 220 metres wide, and is 69.2 metres tall. The stadium uses 258,000square metresof space and has a usable area of 204,000 square metres. It was built with 36 km of unwrapped steel, with a combined weight of 45,000tonnes. The stadium has some 11,000 square metres of underground rooms with waterproof walls. The stadium will cost up to 3.5billionyuan(≈423 millionUSD).

Upon completion, this stadium will boast a state of the art Solar PV system proced bySuntech Power[

Beijing National Aquatics Centre

TheBeijing National Aquatics Centre, also known as theWater Cube(or abbreviated[H2O]3[1]), is an aquatics centre that was built alongsideBeijing National Stadiumin theOlympic Greenfor the2008 Summer Olympics. Ground was broken on December 24, 2003.

Design

In 2002, Government officials engaged architects worldwide in a design competition.Pritzker Prize-winning architectsHerzog & de Meuroncollaborated with ArupSport and China Architecture Design & Research Group to win the competition. Contemporary Chinese artist,Ai Weiwei, is the Artistic Consultant for design.[3]The ground was broken onChristmas EveDecember2003, and construction started inMarch2004, but was halted by the high construction cost inAugust2004and continued again. InJanuary 2008, concerns about construction working conditions arose when it was revealed that at least 10 workers had died ring the stadium's construction.[4]Controversy also surrounded the alleged forced evictions of many residents so the construction could go ahead.

Capacity

The stadium canseatas many as 91,000 spectators ring the Olympics. The capacity will then be reced to 80,000 after the Games. It has replaced the original intended venue of theGuangdong Olympic Stadium[citation needed]. The stadium is 330metreslong by 220 metres wide, and is 69.2 metres tall. The stadium uses 258,000square metresof space and has a usable area of 204,000 square metres. It was built with 36 km of unwrapped steel, with a combined weight of 45,000tonnes. The stadium has some 11,000 square metres of underground rooms with waterproof walls. The stadium will cost up to 3.5billionyuan(≈423 millionUSD).

Upon completion, this stadium will boast a state of the art Solar PV system proced by

Suntech Power[

Ⅳ 鸟巢的官方名称是什么英文翻译是什么也就是老外也叫鸟巢吗

鸟巢的官方名称是北京奥运国家体育场

官方英文翻译是Nest-type Beijing Olympic Stadium或者Beijing National Stadium (Bird's Nest/Olympic Stadium)

老外称呼鸟巢正式的说法自然是Beijing National Stadium
但是随着鸟巢越来越有名,直接叫鸟巢人人能理解时,自然也就简称为the Bird's Nest咯!

【例1】Nest-type Beijing Olympic Stadium was simulated to study the pattern of heat accumulation and its impacts on the growth of tall fescue (Festuca arundinacea).
通过模拟北京奥运国家体育场的鸟巢式框架结构,并对体育场的热集聚效应及其对场内运动草坪生长所造成的影响进行了研究分析。

【例2】The Beijing National Stadium, also known as the bird's nest will be the main track and field stadium for the 2008 Summer Olympics and will be host to the Opening and Closing ceremonies.

Ⅳ 国家鸟巢体育馆、北京烤鸭用英文怎么说

国家鸟巢体育馆:Beijing National Stadium (Bird's Nest/Olympic Stadium)

北京烤鸭: Beijing roast ck

Ⅵ 鸟巢体育场用英语怎么说

鸟巢体育场

The bird's Nest Stadium

注:

stadium
英 [ˈsteɪdiəm]
美 [ˈstediəm]

n.
体育场; 运动场; [医] (疾病的第…) 期;

[例句]Wembley is the showpiece stadium in this country.

温布利球场回是该国最具答代表性的体育场。

Ⅶ 鸟巢英文介绍(配中文互译)

The Beijing National Stadium, also known as the bird's nest will be the main track and field stadium for the 2008 Summer Olympics and will be host to the Opening and Closing ceremonies. In 2002 Government officials engaged architects worldwide in a design competition. Pritzker Prize-winning architects Herzog & de Meuron collaborated with ArupSport and China Architecture Design & Research Group to win the competition. The stadium will seat as many as 100,000 spectators ring the Olympics, but this will be reced to 80,000 after the games. It has replaced the original intended venue of the Guangdong Olympic Stadium. The stadium is 330 metres long by 220 metres wide, and is 69.2 metres tall. The 250,000 square metre (gross floor area) stadium is to be built with 36 km of unwrapped steel, with a combined weight of 45,000 tonnes. The stadium will cost up to 3.5 billion yuan (422,873,850 USD/ 325,395,593 EUR). The ground was broken in December 2003, and construction started in March 2004, but was halted by the high construction cost in August 2004.

In the new design, the roof of the stadium had been omitted from the design. Experts say that this will make the stadium safer, whilst recing construction costs. The construction of the Olympic buildings will continue once again in the beginning of 2005.

北京国家体育馆,也称“鸟巢”,将成为2008年夏季奥运会主要的田径体育场,并在此举办开幕式和闭幕式。它在2002年,由政府官员从来自世界各地的建筑设计比赛作品中选中。普里茨克奖得奖建筑师赫尔佐克&德莫鸿联合Arupsport以及中国建筑设计研究院共同赢得竞赛。奥运会期间,该体育馆将有多达100,000名观众入座,不过,奥运会之后将减少至80,000。它取代了原计划的广东奥林匹克体育场。该体育场长330米, 宽220米,高69.2米。 25万平方米(总楼面面积)大球场共建有36公里长的拆开包装的钢铁,总重量45,000吨。该体育场将耗资高达35.00亿元( 422,873,850美元/ 325,395,593欧元)。2003年12月破土动工,2004年3月开始修建,但在2004年8月,由于建筑成本高昂停产,进行设计修改。

在新的设计中,体育馆的屋顶被做了简化。专家指出,这样做会令大球场安全,并且降低施工成本。建造工作将在2005年年初重新启动。

Ⅷ 英语翻译鸟巢怎样翻译

如只是字面的鸟巢,英文:Birds Nest。如果是北京的那个体育馆:英文:National Stadium,就是国家体育场

Ⅸ 急~奥运体育馆鸟巢用英语怎么说啊

Olympic
Sports
stadium
鸟巢只是一种形象地说法nest
这只是指奥运体育馆
你知道中文与英文的表达方式不一样
我们知道鸟巢可以代表体育馆
但老外不一定知道
你可以再具体像他解释它的形状像鸟巢

阅读全文

与鸟巢体育馆英语相关的资料

热点内容
西安最大的体育馆 浏览:601
省体质检测 浏览:4
长春马拉松全长多少 浏览:825
茂名体育馆周围旅馆 浏览:927
庐江沙溪中学体育老师 浏览:595
拳击裁判知乎 浏览:965
适合小学二年级的体育活动 浏览:137
s7比赛炼金 浏览:224
2016齐鲁弈友比赛通知 浏览:817
lpl有些什么比赛 浏览:943
武汉体育学院公共事业管理怎么样 浏览:632
梅州体育学院杜院长 浏览:906
宿城文化体育中心 浏览:435
小班体育活动捉小鱼 浏览:876
2020年高中篮球特长生招生 浏览:221
北京户外运动圣地 浏览:330
跑马拉松能长寿吗 浏览:846
学习钢琴不能练哪些体育项目 浏览:785
大班体育活动龟兔赛跑 浏览:770
我的体育老师田野的结局 浏览:430